Estey Avenue Residential Mangrove Removal

Naples, Florida Existing single-family home lot being redeveloped into 6 single-family home subdivision.  Project involved coordination with FDEP to receive a residential mangrove removal alteration permit to remove 9,775 SF of mangroves on Rock Creek in Naples, FL. 0.28 credits were purchased through LPI Mitigation Bank. Project will include up to 6-slip dock and riprap…

Details
Arial view of Oceans Edge Resort

Oceans Edge Resort Hotel and Marina

Oceans Edge Resort is the newest luxury hotel and vacation rental resort in the Key West, FL. The 12 acre site boasts 100 condominium units and 16 hotel rooms all with 100% ocean view. The site also provides six pools, 15 boat slips with 8 in-slip pump out connections, fueling facilities, a restaurant and coffee shop, fitness building,…

Details
Picture of Hawks Cay Resort Lagoon

Hawks Cay Resort

Hawks Cay Resort is one of Weiler Engineering Corporation’s most famous projects, located on the secluded island of Duck Key. The resort features 60 acres of resort and marina development. The project required a fine balance between design for both pedestrian and vehicle traffic. The development included a 177 unit hotel, 247 condominium units, park areas, tennis,…

Details

Boat House Coral Lagoon

Marathon, Florida Weiler Engineering Corporation (WEC) was contracted to revise the existing marina layout and expand the dry boat storage capacity with a rock stormwater retention system incorporated within the building footprint; along with the design and permitting of the wastewater treatment plant, and structural engineering of the 25 villas and accessory buildings. This project also required permitting…

Details

Shreve Street Multi-Use Recreational Trail

Punta Gorda, Florida The City of Punta Gorda selected Weiler Engineering Corporation (WEC) to design a 10-foot wide multi-use recreational trail along the existing Shreve Street.  The trail is a two-way asphalt path, which allows for pedestrian and non-motorized recreational vehicle usage.  Signage prohibits usage by unauthorized motorized vehicles, and  the design includes dog waste…

Details
Picture of Cayo Costa State Park

Cayo Costa Restroom Replacement

Weiler Engineering Corporation (WEC) inspected and assessed the existing restroom facility, and due to the poor condition and non-compliance with current building codes, provided the structural design (as well as civil design) for a new elevated restroom at the Cayo Costa State Park Campground. This facility services 300+ visitors a day and is the primary…

Details