Harbor Heights Boat Ramp Improvements

Punta Gorda, Florida Weiler Engineering provided the design and permitting for the Harbor Heights Boat Ramp Improvements, which included the addition of two (2) piers, as well as replacement of the boat ramp and various improvements for ADA access. WEC worked closely with County staff and the Contractor (Kelly Brothers, Inc) throughout the construction and…

Read more

Boat House Coral Lagoon

Marathon, Florida WEC was contracted to revise the existing marina layout and expand the dry boat storage capacity with a rock stormwater retention system incorporated within the building footprint; along with the design and permitting of the wastewater treatment plant, and structural engineering of the 25 villas and accessory buildings. This project also required permitting through the Coast…

Read more