Boat House Coral Lagoon
Marathon, Florida Weiler Engineering Corporation (WEC) was contracted to revise the existing marina layout and expand the dry boat storage capacity with a rock stormwater retention system incorporated within the building footprint; along with the design and permitting of the wastewater treatment plant, and structural engineering of the 25 villas and accessory buildings. This project also required permitting…