Dock/Boardwalk Assessment and Replacement – Collier-Seminole State Park

Collier County, Florida Weiler Engineering Corporation (WEC) provided the civil and structural design for improvements at the Collier-Seminole State Park Boat Basin. An existing 520′ seawall and wooden dock dating to the early 1960’s at the Park’s Boat Basin was in disrepair. WEC conducted and coordinated structural inspections including lead/asbestos testing of the existing facilities,…

Read more

Estey Avenue Residential Mangrove Removal

Naples, Florida Existing single-family home lot being redeveloped into 6 single-family home subdivision.  Project involved coordination with FDEP to receive a residential mangrove removal alteration permit to remove 9,775 SF of mangroves on Rock Creek in Naples, FL. 0.28 credits were purchased through LPI Mitigation Bank. Project will include up to 6-slip dock and riprap…

Read more
Arial view of Oceans Edge Resort

Oceans Edge Resort Hotel and Marina

Oceans Edge Resort is the newest luxury hotel and vacation rental resort in the Key West, FL. The 12 acre site boasts 100 condominium units and 16 hotel rooms all with 100% ocean view. The site also provides six pools, 15 boat slips with 8 in-slip pump out connections, fueling facilities, a restaurant and coffee shop, fitness building,…

Read more
Picture of Hawks Cay Resort Lagoon

Hawks Cay Resort

Hawks Cay Resort is one of Weiler Engineering Corporation’s most famous projects, located on the secluded island of Duck Key. The resort features 60 acres of resort and marina development. The project required a fine balance between design for both pedestrian and vehicle traffic. The development included a 177 unit hotel, 247 condominium units, park areas, tennis,…

Read more