WEC takes pride in our track record of success in working with the municipalities to deliver innovative, cost-effective Civil and Structural Engineering solutions for the citizens of the communities we serve. These include City of Marathon, DeSoto County, Charlotte County, City of Marco Island, Town of Fort Myers Beach, and the Key Largo Wastewater Treatment District, Sarasota County, and the City of Sarasota to name a few. WEC works within the budget constraints of our municipal customers and their existing staff expertise to provide the necessary technical engineering services when and where needed, without the overhead that the municipality take on by maintaining a full-service engineering department.

Charlotte County Park and Recreation Master Plan

Countywide Park and Recreation Master Plan that serves as the foundation for the County’s 2050 park planning and infrastructure needs. WEC was the prime consultant and provided a number of services to complete the plan, including: public outreach and community group/committee collaboration; Regional workshop development; capital project and location needs assessment; Development of a revised…

Read more
Artists Rendering of Punta Gorda Harborwalk

Punta Gorda Harborwalk

The Harborwalk West project is a 15.7 acre park project located on Charlotte Harbor, the project includes seven different zones that encompass complete civil and structural engineering services for the pavilions, restrooms facilities, a playground, tennis courts, a basketball court, small vessel launch, parking, and a 20 foot walkway that connects Harborwalk East to Fisherman’s…

Read more

Sunrise Park Master Plan

Charlotte County, Florida WEC was contracted by Charlotte County to develop the Sunrise Park Master Plan. This task required WEC staff to conduct public outreach, obtain a completed survey, and draft landscape design. The design included a playground, improved kayak launch, tennis courts, restroom facilities, community building, associated parking, concept stormwater management system, and infrastructure…

Read more

Shreve Street Multi-Use Recreational Trail

Punta Gorda, Florida The City of Punta Gorda selected Weiler Engineering Corporation (WEC) to design a 10-foot wide multi-use recreational trail along the existing Shreve Street.  The trail is a two-way asphalt path, which allows for pedestrian and non-motorized recreational vehicle usage.  Signage prohibits usage by unauthorized motorized vehicles, and  the design includes dog waste…

Read more

Veterans Park at G.C Herring Park – Rotonda

Punta Gorda, Florida Charlotte County contracted with WEC to provide concept planning and design-build of a new Veterans Park Memorial at the G.C. Herring Park located adjacent to an active American Legion. With several acres of the park area vacant, the County developed a plan with the stakeholder groups and staff to provide a section…

Read more

Veterans Memorial Eternal Fountain—Kiwanis Park

Punta Gorda, Florida WEC teamed with our sister company, Exotic Pools By Janeen, to prepare analyze and prepare four Concept Plans for the Kiwanis Park and fountain area near the Justice Center and Laishley Park. WEC prepared detailed layouts and alternative materials for a variety of components, including pavers, engraved memorial walls, fountain and lighting…

Read more

Dock/Boardwalk Assessment and Replacement – Collier-Seminole State Park

Collier County, Florida Weiler Engineering provided the civil and structural design for improvements at the Collier-Seminole State Park Boat Basin. An existing 520′ seawall and wooden dock dating to the early 1960’s at the Park’s Boat Basin was in disrepair. WEC conducted and coordinated structural inspections including lead/asbestos testing of the existing facilities, and provided…

Read more

Tropical Plantation Preserve Park

Islamorada, Florida The Village of Islamorada contracted Weiler Engineering to make substantial improvements to a City park known as the Tropical Plantation Preserve.   The preserve is a 3-acre park with landscaping, small craft launch, trails and monuments.  The park is located adjacent to the Overseas Heritage Trail at MM 90, bayside, in Islamorada.  Weiler was…

Read more

City of Marathon Stormwater / Paving Public Works Project

Marathon, Florida The Weiler Engineering staff are experienced stormwater management system designers, modelers and inspectors.  For example, Weiler Engineering provided design and construction engineering and inspection for the City of Marathon’s $27 million stormwater management system.  The goal of the project was to provide a complete stormwater system to serve all City right-of-ways where very…

Read more

Harbor Heights Boat Ramp Improvements

Punta Gorda, Florida Weiler Engineering provided the design and permitting for the Harbor Heights Boat Ramp Improvements, which included the addition of two (2) piers, as well as replacement of the boat ramp and various improvements for ADA access. WEC worked closely with County staff and the Contractor (Kelly Brothers, Inc) throughout the construction and…

Read more