Village of Islamorada Stormwater Assessment

The Weiler Engineering Corporation (WEC) worked with Village staff to identify thirteen areas, including Venetian Shores, of concern throughout the Village that were experiencing excessive flooding. WEC collected existing data, prepared concept designs, estimated budgets and assisted the Village to identify funding opportunities for each site. The report provided a technical assessment of the Islamorada…

Read more

Key Largo Wastewater District

Weiler Engineering Corporation (WEC) staff manages a team of inspectors who are onsite full time to witness and document all construction activities at the wastewater treatment plant and six offsite remote vacuum pump and sewer pumping facilities for the Key Largo Wastewater District. WEC management coordinates all inspection reports and daily quantities for use on…

Read more

City of Marathon Stormwater Public Works Project

Weiler Engineering Corporation (WEC) serves as the City of Marathon’s engineering consultant for the Marathon’s stormwater project. Services provided include full construction administration, engineering, and inspection services. WEC provided full time construction inspection for all 9 collection systems, 6 wastewater treatment plant sites and the remote vacuum pump station. WEC construction managers were responsible for…

Read more
South Gulf Cove/Butterford Breach Feasibility Study and Repair

South Gulf Cove/Butterford Breach Feasibility Study and Repair

Weiler Engineering Corporation (WEC) was contracted by Charlotte County, Florida, to conduct an environmental/hydrologic study providing complete design, permitting and construction administration including ecological/environmental monitoring. The South Gulf Cove/Butterford Breach feasibility study and repair project included removing a spoil berm and filling in a drainage ditch which caused a breach that had been constructed over…

Read more
Artists Rendering of New Mural

New mural on the Harbor

Downtown Punta Gorda is getting a new Mural! The City’s Harborwalk is the site for the 31st mural from the Punta Gorda Historic Mural Society. This one promises to be the most visited mural yet, with pedestrian traffic of over 2,000 people per day in season. Appropriately named, “Tails from the Harbor,” the mural will…

Read more