Sombrero Beach Road Extension and Multi-Use Trail

Marathon, Florida WEC developed the design for this FDOT funded project.  The multi-use trail  and stormwater facilities were immediately adjacent to environmentally sensitive areas and Outstanding Waters of State Concern. Extensive coordination with SFWMD and the local Utility provider was required for this project.  In addition to the Sidewalk  and multi-use trail, the design also…

Read more

Knight’s Key Shoreline Protection

Marathon, Florida WEC was hired to design and engineer Shoreline Protection at Knights Key in Marathon, Florida. The existing site was very low and buffered by mangroves along the shoreline. In an effort to protect the site from flooding and preserve the existing mangrove fringe, WEC designed over 1200 LF of Rip Rap with geotextile…

Read more